K-G-6 / Palesse KG-6 combine harvester, operating, maintenance instructions and wiring diagrams e-manual (in Russian)
Only original manuals
Available immediately after payment
Full compliance with the paper edition
100% protection of your payments
Publisher: © "PowerLine"
ISBN: 977-129-542-470-2
Number of pages: 167
Format: file PDF
In the manual you will find
- Instructions for self-care and maintenance
- Information about the design of the combine harvester and how to prevent malfunctions
- Information for a trip to the service station if self-repair is not possible
Publisher:
PowerLine
Categories:
Combine-harvesters
Only original manuals
Available immediately after payment
Full compliance with the paper edition
100% protection of your payments
Publisher: © "PowerLine"
ISBN: 977-129-542-470-2
Number of pages: 167
Format: file PDF
In the manual you will find
- Instructions for self-care and maintenance
- Information about the design of the combine harvester and how to prevent malfunctions
- Information for a trip to the service station if self-repair is not possible
Contents
For the attention of the heads of operating organizations and machine operators
Accepted abbreviations and symbols
Safety requirements
Safety signs
Description and operation
- Purpose
- Technical characteristics
- Combine harvester composition
- Device
- Engine installation
- Power vehicle drives
- Attachment
- Drawbar
- Hydraulic system of the chassis drive
- Hydraulic system of the steering and power hydraulic cylinders
- System pneumatic
- Electrical diagram
- Controls and instruments
- Cabin
- Air handling unit panel
- Control panel
- Steering column
- Seat
- Reversing the workstation
- Control panel
- Signal panel
Intended use
- Operating limitations
- Preparing the power source for use
- Preparing a new power source
- Preparing the power source after long-term storage
- General instructions for additional assembly
- Installing and connecting batteries
- Refueling the power plant
- Capacity of the refueling tanks
- Checking the oil level in the engine sump
- Refueling the engine cooling system
- Refueling
- Refueling the hydraulic systems
- Filling the hydraulic systems of the brake drive and the gearshift locking mechanism
- Starting and stopping the engine, starting off
- Running in the power plant
- Engine operation at low temperatures
- Starting the hydraulic drive of the chassis of the power plant at low temperatures
- Starting the hydraulic system of the steering control and power hydraulic cylinders at low temperatures
- Operation of the transmission and gearshift box at low temperatures
- Using the power plant
- Aggregation power equipment
- Using the attachment
- Combine drive
- Connecting the power systems on the engine side
- Connecting the power systems on the cabin side
- Using the tires
- Adjustments
- Adjusting the force on the handles
- Adjusting the transport lights
- Adjusting the axle bearings of the final drive
- Adjusting the brakes
- Adjusting the toe-in of the steering axle
- Adjusting the engine speed limit
- Adjusting the PTO engagement mechanism
- Adjusting the hitch clamps
- Adjusting the gear shift mechanism
- Adjusting the speed control mechanism
- Adjusting the advance of the trailer machine air brakes
- Adjusting the gap between the fan blades and the diffuser shell of the radiator unit
- Adjusting the engine stop mechanism
- Adjusting the tapered bearings of the hub of the steering wheels of the UES-280
- Possible malfunctions and methods for eliminating them
- Brakes
- Gearbox
- Final drive of the drive wheels
- Propeller shafts
- Steering axle
- Hydraulic drive of the chassis
- Hydraulic system of steering and power hydraulic cylinders
- Electrical equipment
- Engine starting system
- Engine
- Pneumatic system
Maintenance
- General instructions
- Types and frequency of maintenance
- Safety requirements
- List of works by types of maintenance
- Maintenance of the UES in preparation for operational running-in
- Maintenance of the UES during operational running-in
- Maintenance after completion of operational running-in
- Shift maintenance (STM)
- First maintenance (TO-1)
- Second maintenance (TO-2)
- Third maintenance (TO-3)
- Seasonal maintenance during transition to autumn-winter period of operation (TO-OZ)
- Seasonal maintenance during the transition to the spring-summer period of operation (TO-VL)
- Lubrication
- Changing the engine oil
- Servicing the engine air cleaning system
- Lubrication of the splined connection of the main drive shaft and replacement and shock absorbers on the sleeve-and-pin coupling
- Maintenance, lubrication and control check of cardan shafts
- Maintenance of hydraulic systems of the power vehicle
- Maintenance of the pneumatic system of the power plant
- Maintenance of the cassette filters of the ventilation unit
- Maintenance of the air conditioning unit
Storage
- General requirements for storage
- Preparation for storage
- Maintenance during storage
- Maintenance of batteries during storage
- Methods of preservation
- Methods of depreservation
Transportation and towing
Appendix
- Schematic diagram of the hydraulic drive of the chassis UES-280
- Schematic diagram of the hydraulic drive of the chassis UES-2-280A
- Schematic diagram of the hydraulic steering and power hydraulic cylinders UES-280
- Schematic diagram of the hydraulic steering and power hydraulic cylinders UES-2-280A
- Schematic diagram of the pneumatic UES-280
- Schematic diagram of the pneumatic UES-2-280A
- List of electrical equipment components UES-280 123
- List of electrical equipment components UES-2-280A
- Schematic diagram of the electrical power supply UES-280
- Schematic diagram of the UES-2-280A power plant
- Schematic diagram of the UES-280 electrohydraulics and attachment control
- Schematic diagram of the UES-2-280A electrohydraulics and attachment control
- Schematic diagram of the distribution cabinet connections
- Schematic diagram of the metal detector control of the mounted combine
- Schematic diagram of the UES-2-280A air conditioner control
- Schematic diagram of the operation of the BICH
- Filling tanks
- Applied electric lamps
- Maintenance of pneumatic hydraulic accumulators
- Logbook of measurements of internal pressure in tires
- Frequency measurement unit rotation BICH-U
- Unit conversion table
Album of educational posters on 18 sheets
- Universal power equipment UES-2-250A "PALESSE 2U250A", UES-2-280A "PALESSE 2U280A"
- Engine installation
- Engine installation UES-2-280A "PALESSE 2U280A"
- Air intake
- Chassis of power equipment
- Chassis of power equipment UES-280
- Range box. Final drive
- Attachment
- Cabin. Control platform
- Cabin. Control platform UES-2-280A "PALESSE 2U280A"
- Controls
- Pneumatic systems
- Hydraulic system of steering and power hydraulic cylinders
- Hydraulic unit BSK 40 MK2
- Hydraulic system of chassis drive
- Hydrostatic transmission
- Hydrostatic transmission operation diagram
Write a review
Your Name:
Your Review:
Customers reviews
Сам провёл полную диагностику гидросистемы. Смог устранить течь на распределителе и заменить фильтры без обращения в сервис. Расписано, какие смазки и в какие узлы - не пришлось гуглить.


