Наши книги можно приобрести по карточкам єПідтримка!

Komatsu PC400-7 / РС400LC-7 excavator, repair e-manual (in Russian)

How to pay and download
Only original manuals
Available immediately after payment
Full compliance with the paper edition
100% protection of your payments
(8)
Publisher: © "PowerLine"
ISBN: 977-129-542-441-9
Number of pages: 794
Format: file PDF

About the manual

Engine type: SAA6D125E3

In the manual you will find

  • Step-by-step guide to repair various components and assemblies
  • Self-care and maintenance instructions
  • Excavator design and prevention information
  • Information for a trip to the service station, if self-repair is not possible
Publisher: PowerLine
Categories: Excavators , Komatsu
Only original manuals
Available immediately after payment
Full compliance with the paper edition
100% protection of your payments
Publisher: © "PowerLine"
ISBN: 977-129-542-441-9
Number of pages: 794
Format: file PDF

About the manual

Engine type: SAA6D125E3

In the manual you will find

  • Step-by-step guide to repair various components and assemblies
  • Self-care and maintenance instructions
  • Excavator design and prevention information
  • Information for a trip to the service station, if self-repair is not possible

Contents

Preface

General provisions

  • General assembly drawing
  • Technical specifications
  • Weight table
  • List of lubricants and coolants

Design, purpose and maintenance standards

  • Engine-related parts
  • Radiator, oil cooler, aftercooler
  • Power transmission
  • Final drive
  • Sprocket
  • Platform Swing Gear
  • Swing circle
  • Track frame, tension spring
  • Idler
  • Carrier roller
  • Track roller
  • Track shoe
  • Hydraulic equipment layout
  • Hydraulic tank
  • Hydraulic pump
  • LS(PC) valve
  • Variable volume valve
  • Control valve
  • Main relief valve
  • Closed center load sensing system (CLSS)
  • Self-relieving valve
  • Swing motor
  • Back pressure prevention valve
  • Center swivel joint
  • Travel motor
  • Travel union valve
  • Valve control system
  • Travel PPC shuttle valve
  • Work equipment
  • Platform swing PPC valve
  • Travel PPC valve
  • Additional PPC valve
  • Solenoid valve
  • PPC accumulator
  • Return oil filter
  • Boom hydraulic drift prevention valve
  • Arm hydraulic drift prevention valve
  • Quick return valve
  • Lift check valve
  • Additional equipment circuit changeover valve
  • Locking valve
  • Hydraulic cylinder
  • Working equipment
  • Fire heater and related parts
  • Engine management system
  • Electronic control system
  • Monitoring system (technical characteristics of multifunctional monitoring system)
  • 7-segment monitoring system
  • Sensor

Checking and adjusting

  • Standard value table for engine
  • Standard value table for chassis
  • Checking and adjusting
  • Troubleshooting
  • List of tools for checking, adjusting and diagnosing faults
  • Measuring engine speed
  • Measuring pressure air intake
  • Measuring exhaust gas temperature
  • Measuring exhaust gas color
  • Adjusting valve clearance
  • Measuring compression pressure
  • Measuring blowby pressure
  • Measuring engine oil pressure
  • Working with fuel system devices
  • Relieving residual pressure in the fuel system
  • Measuring fuel pressure
  • Bleeding air from the fuel circuit
  • Checking the fuel circuit for leaks
  • Adjusting the engine speed sensor
  • Checking and adjusting the fan belt and alternator belt tension
  • Measuring the bearing clearance of the turntable
  • Checking and adjusting the track chain tension
  • Checking and adjusting the oil pressure in the hydraulic circuits of the working equipment, platform rotation and travel
  • Measuring the main pressure in the control circuit
  • Checking and adjusting the oil pressure in the control circuit of the PC pump
  • Checking and adjusting the oil pressure in the control circuit of the LS pump
  • Measuring the pressure at the outlet of the solenoid valve
  • Measuring the pressure at the outlet of the PPC valve
  • Adjusting the clearance in the PPC valves of the working equipment and platform rotation

Disassembly and assembly

  • How to use this manual
  • Precautions when performing work
  • List special tools
  • Removing and installing the cylinder head assembly
  • Removing and installing the rear engine seal
  • Removing and installing the front engine seal
  • Removing and installing the booster pump
  • Removing and installing the fuel injector assembly
  • Removing and installing the injector tip
  • Removing and installing the starter assembly
  • Removing and installing the radiator assembly
  • Removal and installation of hydraulic system oil cooler assembly
  • Removal and installation of engine and hydraulic pump assembly
  • Removal and installation of turntable assembly
  • Removal and installation of platform swing hydraulic motor and platform swing gearbox assembly
  • Disassembly and assembly of platform swing hydraulic motor and platform swing gearbox assembly
  • Removal and installation of sprocket
  • Removal and installation of travel hydraulic motor and final drive assembly
  • Disassembly and assembly of final drive assembly
  • Disassembly and assembly of support roller
  • Disassembly and assembly of track roller
  • Disassembly and assembly of guide wheel
  • Disassembly and tension spring assembly
  • Removal and installation of track chain assembly
  • Removal and installation of operator's cabin assembly
  • Removal and installation of pump controller
  • Removal and installation of swing frame assembly
  • Removal and installation of counterweight assembly
  • Removal and installation of hydraulic tank assembly
  • Removal and installation of hydraulic pump assembly
  • Removal and installation of hydraulic pump input shaft seal
  • Removal and installation of distribution valve assembly
  • Disassembly and assembly of distribution valve assembly
  • Removal and installation of central swivel joint assembly
  • Disassembly and assembly of central swivel joint assembly
  • Disassembly and assembly of the PPC valve of the working equipment
  • Disassembly and assembly of the PPC valve of the travel control assembly
  • Disassembly and assembly of the hydraulic cylinder assembly
  • Removal and installation of the working equipment assembly
  • Removal and installation of the operator's cabin glass (glued-in glass)
  • Removal and installation of the front window Assembly

Supplement for excavator with boom offset

  • Specification drawings
  • Technical characteristics
  • Weight table
  • Checking and adjustment
  • Troubleshooting
  • Standards maintenance

Other

  • Hydraulic circuit diagram
  • Electrical circuit diagram (for extremely low temperatures)

Write a review

Your Name:
Your Review:
Rating:

Customers reviews

from Олег on 25/02/2025
Получилось отремонтировать механизм поворота. Хорошее описание диагностики, понятные электрические схемы. Немного не хватает пояснений по снятию отдельных узлов, но базовая информация изложена грамотно.
This website uses cookies. By clicking ACCEPT or staying on this site, you agree to our use of cookies. Learn more
Accept